BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Americans for a Clean Energy Grid - ECPv6.18.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Americans for a Clean Energy Grid
X-ORIGINAL-URL:https://cleanenergygrid.org
X-WR-CALDESC:Events for Americans for a Clean Energy Grid
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20240909T130000
DTEND;TZID=America/New_York:20240909T140000
DTSTAMP:20240909T200453Z
CREATED:20240822T152211Z
LAST-MODIFIED:20240909T200453Z
UID:12521-1725886800-1725890400@cleanenergygrid.org
SUMMARY:ACEG Transmission Time Webinar: A Deep Dive Into Interregional Transmission Planning
DESCRIPTION:Interregional transmission planning is essential for connecting diverse energy resources across regions\, ensuring grid stability\, and reducing customer costs. The North American Electric Reliability Corporation (NERC) is conducting an Interregional Transfer Capability Study (ITCS) study to be filed with the Federal Energy Regulatory Commission (FERC) this December\, and FERC is expected to act on interregional transmission sometime this fall. Americans for a Clean Energy Grid’s forthcoming interregional transmission principles lay out that FERC’s interregional transmission planning rule should include (1) a minimum transfer requirement\, (2) cost allocation\, and (3) the incorporation of interregional\, independently developed transmission lines in interregional planning efforts.  \nDuring this webinar\, NERC presented key data from their forthcoming ITCS study. Then\, panelists discussed how increased interregional transmission can help enhance grid reliability\, what actions should be taken at the state and federal level\, and what lies ahead for interregional transmission planning.  \nFeatured speakers included: \n\nStacey Burbure – American Electric Power\nJohn Moura – North American Electric Reliability Corporation\nNicole Luckey – Invenergy\nJoe DeLosa – The Brattle Group\nChristina Hayes (moderator) – Americans for a Clean Energy Grid\n\n 
URL:https://cleanenergygrid.org/event/aceg-transmission-time-webinar-september-2024/
ATTACH;FMTTYPE=image/png:https://cleanenergygrid.org/wp-content/uploads/2024/08/SEPTEMBER-TT_1-1.png
END:VEVENT
END:VCALENDAR